AirCooledNut.com

Home > Misc > Our storage shed made by Tuff Shed
Finished.  This process took me 4.5 hours to complete but was well worth it.   Now the 4"x4" pressure treated lumber is locked into position.

Finished. This process took me 4.5 hours to complete but was well worth it. Now the 4"x4" pressure treated lumber is locked into position.

2007_Thanksgiving_020.jpg Bus_middle_seat_001.jpg 045.JPG shed_site_003.jpg 2007_Christmas_009.jpg 2007_Christmas_026.jpg Bus_middle_seat_010.jpg