Home
Login
AirCooledNut.com
Album list
Last uploads
Last comments
Most viewed
Top rated
My Favorites
Search
Home
>
Zoom-zoom
>
How-to
>
Apache lift box repair
FILE 9/24
I ground the planetary pin level and then drilled a 3/16" hole in it to a half-inch depth. I got a piece of 3/16" rod from the local hardware store, beveled the edge, then pushed it into the hole.
File information
Filename:
IMAG1677.jpg
Album name:
icbm
/
Apache lift box repair
Filesize:
368 KiB
Date added:
Oct 11, 2014
Dimensions:
1008 x 604 pixels
Displayed:
351 times
EXIF Image Height:
604 pixels
EXIF Image Width:
1008 pixels
FlashPix Version:
version 1
ISO:
100
Make:
Htc
Model:
PC36100
Resolution Unit:
Inch
X Resolution:
72 dots per ResolutionUnit
Y Resolution:
72 dots per ResolutionUnit
YCbCrPositioning:
Center of Pixel Array
URL:
http://www.aircoolednut.com/cmgallery/displayimage.php?pid=3423
Favorites:
Add to Favorites